I have to remove this layer of subfloor to get it down to the same height to match the existing hardwood which sits on top of the 3/4" plywood above the floor joists.
I considered pouring level quick but then I would be way higher than my existing floor.
I used a Hilti jack hammer type unit today (my plumber lent it to me) Had a 4-5" wide spade bit and man did it ever make quick work of the tiles. Popped most of them up whole, some came off in pieces but did about 400 sp ft in less than 2 hours. Kids were packing tiles out and didnt take too long. Tmrw I will try this thing and see if it will get in between the sub floor and 3/4" plywood but I'm not holding my breath.
I need a few hungry hard working young lads for this job... LOL
Thanks for all the replies.