Quote:
Originally Posted by K44
Screw piles is what I wanted to use but there is no one that does it there and there is to much rock. Concrete would be great but access is not good enough to bring a concrete truck in
|
If there is too much rock for screwpiles [I'm thinking river bed here], you'll have a bugger of a time digging holes for your piles, as well. In that situation, I'm thinking you could get by with a surface footing. Only reason to use piles would be to get through frost penetration and counter heave. Don't think you're going to have enough of a problem there to worry about.
Grizz
__________________
"Indeed, no human being has yet lived under conditions which, considering the prevailing climates of the past, can be regarded as normal."
John E. Pfeiffer The Emergence of Man
written in 1969
|