Originally Posted by Esox View Post
Permit needs to be posted at site. They're only allowed to withdraw water at a certain rate that is in the permit. If its three pumps, Im assuming its for a pipeline hydrotest or a frac which is then authorized under a TDL but also a code of practice for water withdraw for hydrostatic testing. Its also probably through AEP not AER.
This guy is bang on!

under a TDL ( temporary diversion License) granted all the time...... Our Province's mandate is we are able to utilize up to 50% of the surface water and let the rest flow to the neighbors..... we don't even come close to utilizing that allocation.