Try Screw Pilings
I built my cabin and used screw pilings. Were installed in 3 hours and within mm of level ( No shims at all). Best thing was the time savings and no need to dig. Cabin has been rock steady for 3 years of freeze thaw. Piles get screwed down below frost line. Size of pile depends on loading.
|