Permit needs to be posted at site. They're only allowed to withdraw water at a certain rate that is in the permit. If its three pumps, Im assuming its for a pipeline hydrotest or a frac which is then authorized under a TDL but also a code of practice for water withdraw for hydrostatic testing. Its also probably through AEP not AER.