Quote:
Originally Posted by mountainmike
Under A GRAND FOR A PAD you robbed someone
|
The concrete was probably stolen.
Let's see now. 24x 24 =576 Sq. ft. , x .333 = 192 cu. ft div. by 27= 7 cu. yds + 3/4 for thickening = 7 3/4 yds. not including an apron, at 150 bucks/ yd. [haven't priced any lately, so I'm probably guessing low
] = 1162.50 Add steel, any excavation, forming and Finish labor.
Grizz