4x6 PT post, 8" hole, 2" of rock at the bottom, concrete all the way up.
Make sure your concrete is at least 1 inch above final grade, and sloped away from the post in all directions. My fence is 15 years old and the posts are as solid as the day I put them in.
__________________
Social acceptance is NOT effective therapy.
|