Thread: Pipeline
View Single Post
  #13  
Old 01-15-2018, 11:18 AM
play.soccer play.soccer is offline
Banned
 
Join Date: Aug 2014
Posts: 933
Default

He will hate chucking skids all day in -30 weather. Waist deep in skeg adding skids to the pile to hold up the pipe, draining the ditch so welders can weld and NDE can inspect. If anything once he does the job it will motivate him to get a better job.


I'm an NDE tech and have done many pipelines, never once have I ever wished I was on the front end of mainline lol.
Reply With Quote