Go Back   Alberta Outdoorsmen Forum > Main Category > General Discussion

Reply
 
Thread Tools Display Modes
  #1  
Old 02-21-2014, 01:13 AM
leeaspell's Avatar
leeaspell leeaspell is offline
 
Join Date: Jul 2010
Location: Whitecourt
Posts: 7,024
Default Good ol nighshift

A picture and a song that seem to go hand in hand tonight




https://www.youtube.com/watch?v=yMfw...e_gdata_player
Reply With Quote
  #2  
Old 02-21-2014, 01:23 AM
Matt L.'s Avatar
Matt L. Matt L. is offline
 
Join Date: Sep 2008
Location: Whitecourt
Posts: 5,818
Default

If it makes you feel any better, I'm at the AFGA conference in Ft. Mac right now...
Reply With Quote
  #3  
Old 02-21-2014, 01:32 AM
pickrel pat pickrel pat is offline
 
Join Date: Jul 2007
Posts: 7,268
Default

sitting in my loader atm..... nightshift 6-6 for 4 months straight now...all good.
Reply With Quote
  #4  
Old 02-21-2014, 01:34 AM
Ken07AOVette's Avatar
Ken07AOVette Ken07AOVette is offline
 
Join Date: Dec 2008
Location: Alberta
Posts: 24,071
Default

Just got back from a 911 call.

Be safe everyone.
__________________
Only dead fish go with the flow. The rest use their brains in life.


Originally Posted by Twisted Canuck
I wasn't thinking far enough ahead for an outcome, I was ranting. By definition, a rant doesn't imply much forethought.....
Reply With Quote
  #5  
Old 02-21-2014, 01:37 AM
BANG BANG is offline
 
Join Date: May 2010
Posts: 1,215
Default

You get to work days OR nights ?
Sweet!
These 135hr weeks kick a guy in the arse after a while
Reply With Quote
  #6  
Old 02-21-2014, 01:54 AM
Steve07's Avatar
Steve07 Steve07 is offline
 
Join Date: Jun 2007
Location: Drumheller, AB
Posts: 187
Default

Calving cows 24/7 since January... Could be worse, like an office job maybe.
Reply With Quote
  #7  
Old 02-21-2014, 03:57 AM
neznam's Avatar
neznam neznam is online now
 
Join Date: Nov 2012
Location: Calgary
Posts: 186
Default

I'm just starting 4:00 -10:30 am.
This have to be the worst kind of shift.
Reply With Quote
  #8  
Old 02-21-2014, 04:53 AM
nof60 nof60 is offline
Banned
 
Join Date: Oct 2007
Location: Mt. Lorne, Yukon
Posts: 1,188
Default

3 more hours than off till Thursday
Reply With Quote
  #9  
Old 02-21-2014, 06:09 AM
wolf308 wolf308 is offline
 
Join Date: May 2010
Location: red deer
Posts: 3,379
Default

Omg. Awesome lee. I'm not on nights at moment with newest job. But crew change is at 5 to 5 alberta time. Or 6 here in sask. Also have plenty o 400 s. Fraccing thru the coil. I just recently went back to coil from a drilling rig where more often than not was on nights.
Reply With Quote
  #10  
Old 02-21-2014, 06:50 AM
Taco Taco is offline
 
Join Date: Dec 2007
Location: Claresholm, Ab
Posts: 4,022
Default

Quote:
Originally Posted by Steve07 View Post
Calving cows 24/7 since January... Could be worse, like an office job maybe.
January weren't too bad but February kinda doin' the suction ain't it?

Good luck with that.
Reply With Quote
  #11  
Old 02-21-2014, 09:27 AM
Mike_W's Avatar
Mike_W Mike_W is offline
 
Join Date: May 2007
Location: Stony Plain
Posts: 6,433
Default

Quote:
Originally Posted by BANG View Post
You get to work days OR nights ?
Sweet!
These 135hr weeks kick a guy in the arse after a while
You really work 20 hours a day 7 days straight?
Reply With Quote
  #12  
Old 02-21-2014, 09:48 AM
Fisherpeak Fisherpeak is offline
Banned
 
Join Date: Jan 2010
Location: Kimberley B.C.
Posts: 5,234
Default

I plow snow with a cat loader and a 12 foot pusher from 2 A.M. till 2 P.M.
I love night shift,nobody around,cruising down the main drag in the dark,heater and radio on.Beats hell out of construction work.I did that for too long.
Reply With Quote
  #13  
Old 02-21-2014, 10:13 AM
CaberTosser's Avatar
CaberTosser CaberTosser is offline
 
Join Date: Aug 2007
Location: Calgary
Posts: 19,420
Default

Quote:
Originally Posted by Mike_W View Post
You really work 20 hours a day 7 days straight?
He's probably accounting for the OT hours added to the actual hours worked.
__________________
"The trouble with people idiot-proofing things, is the resulting evolution of the idiot." Me
Reply With Quote
  #14  
Old 02-21-2014, 01:36 PM
gmcmax05 gmcmax05 is offline
 
Join Date: Feb 2011
Posts: 1,034
Default

Quote:
Originally Posted by Mike_W View Post
You really work 20 hours a day 7 days straight?
You smelt that too, lol
Reply With Quote
  #15  
Old 02-21-2014, 08:49 PM
BANG BANG is offline
 
Join Date: May 2010
Posts: 1,215
Default

Nope thats for real.its not 20hrs a day straight up sometimes 16-17 hrs a day sometimes way more evens out to 135 ish usualy .
To be fair though im on a 7-7 shift so plenty of time to recouperate.
And usualy get to sneak in a nap here and there.
Well worth it to essentualy have half the year off.

Back in the day when i was doing drill pipe/tubing inspection we would do 20hr days for a lot longer then 7 in a row.was well worth the $9 hr.lol

Last edited by BANG; 02-21-2014 at 08:54 PM.
Reply With Quote
  #16  
Old 02-21-2014, 10:35 PM
Mike_W's Avatar
Mike_W Mike_W is offline
 
Join Date: May 2007
Location: Stony Plain
Posts: 6,433
Default

I thought employers were limited to 15 or 16 hours straight as max shift? Maybe this is only a union thing but I though it was work safety standards.
Reply With Quote
  #17  
Old 02-21-2014, 10:39 PM
leeaspell's Avatar
leeaspell leeaspell is offline
 
Join Date: Jul 2010
Location: Whitecourt
Posts: 7,024
Talking

Quote:
Originally Posted by Mike_W View Post
I thought employers were limited to 15 or 16 hours straight as max shift? Maybe this is only a union thing but I though it was work safety standards.
What it says on paper you can work vs what you actually work are 2 totally different things.
Reply With Quote
  #18  
Old 02-21-2014, 11:45 PM
Steve07's Avatar
Steve07 Steve07 is offline
 
Join Date: Jun 2007
Location: Drumheller, AB
Posts: 187
Default

Quote:
Originally Posted by Taco View Post
January weren't too bad but February kinda doin' the suction ain't it?

Good luck with that.
Seems to be the pattern the past few years. Feb is set to double down on said suction for a few days it appears...
Reply With Quote
  #19  
Old 02-22-2014, 12:20 AM
220swifty's Avatar
220swifty 220swifty is offline
 
Join Date: Dec 2007
Location: Red Deer
Posts: 4,998
Default

Quote:
Originally Posted by Mike_W View Post
I thought employers were limited to 15 or 16 hours straight as max shift? Maybe this is only a union thing but I though it was work safety standards.
Oops.

I wish someone told me that before I spent 22 hrs pouring concrete in the summer heat.

Or 26 hrs clearing snow in a loader because I was the only operator available.
__________________
I'm not saying I'm the man, but it's been said.
Reply With Quote
  #20  
Old 02-22-2014, 01:24 AM
brslk's Avatar
brslk brslk is offline
 
Join Date: Oct 2012
Location: Edmonton
Posts: 2,375
Default

Quote:
Originally Posted by 220swifty View Post
Oops.

I wish someone told me that before I spent 22 hrs pouring concrete in the summer heat.

Or 26 hrs clearing snow in a loader because I was the only operator available.
Sometimes stuff needs to get done and some men are man enough to stand up and do it.

I've worked 48 hours straight when other have called in sick. The job need to be done.

Ive worked 80 hour weeks to help out the people I work for and they have cut me a lot of slack now that I have medical issues.

You get what you put in and people get what they deserve.
Reply With Quote
  #21  
Old 02-22-2014, 03:58 AM
Steve07's Avatar
Steve07 Steve07 is offline
 
Join Date: Jun 2007
Location: Drumheller, AB
Posts: 187
Default

Quote:
Originally Posted by brslk View Post
You get what you put in and people get what they deserve.
You forgot what comes after that... Still I ain't seen mine.
Reply With Quote
Reply


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -6. The time now is 10:33 AM.


Powered by vBulletin® Version 3.8.5
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.